999Kw solar project
Study and technical report of the 999 kW solar project Darchula.
Established in 2019, BuildAsia Research and Developers Pvt.Ltd. has been operating as a professional consortium, delivering socio-techno excellence across Nepal’s hydropower, renewable energy, road, bridge, and urban infrastructure sectors.
We provide services in different dimensions: Engineering Design, Construction Management, Hydropower, Renewable Energy, Research & Innovation, Knowledge Dissemination, and Social Development.
We specialize in a wide range of construction services, including residential, commercial, and industrial projects.
Study and technical report of the 999 kW solar project Darchula.
Study, survey, and detailed design of Mahakali Buspark Darchula, Feb, 2026.
Survey, study, and design of tourism infrastructure of Kakani Nuwakot and Kathmandu, mayor area are cable car, trekking route, resort and eco-tourism.
Two motorable bridges study, survey, and design of the Dhading district at 2023, the length of bridges are 40 m and 70 m.
Study, review, design, and construction supervision of 4 MW hydro at Badigaht Palika, Baglung, and survey design of cascade system of 5 MW.
Techical review and design update of RuRu banchu Hydro 16 MW hydro of Kalikot district.
Technical review, design, and report work. Key feature are head 212m, water conveyance
Field study, Survey, design, and report preparation of 650Kw 2025/26. Key features are 80m Head, 1020 LPS dry water flow, length of water conveyance 1100m
Field study, Survey, design, and report preparation of 1506 Kw (1.506 MW) hydropower in 2019. Key feature of 163 M head, discharge 1.2 Cumec, 2.5 Km water conveyance
Field study, Survey, design, bankable investment report, and construction supervision of 2000 kW hydropower in 2022 to continue. Key features of 242 M head, discharge 1.01 Cumec, 2.4 Km water conveyance, annual energy 12.2 GWH, and the project is under construction.
Field study, Survey, design, and report preparation of 900 Kw 2025. Key features are 210 Head, 210 LPS dry water flow, length of water conveyance 900m